The central courtyard with its bricked pond ready for the waterproofing. There will be a chain downpipe off the mid roof that feeds the pond. A steel and timber bridge will extend over the pond from the doors (do I hear you saying "build a bridge") The upper white wall is to be painted steel rust and the lower white wall is to be coloured render. The foreground will be paved with a japanese style pergola over.
Friday, April 30, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment