skip to main
|
skip to sidebar
Mike and Lee's new home
Wednesday, June 9, 2010
The chain down pipe has also been installed in the central courtyard and supplying water into the central pond - the fish can't wait for all that extra swimming room.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
►
2011
(10)
►
February
(2)
►
January
(8)
▼
2010
(89)
►
August
(14)
►
July
(25)
▼
June
(18)
The boss runs a keen eye over the workmanship. The...
Feature tiles at the end of the bath in the upstai...
Finished tiled feature wall in the upstairs bathro...
More colour being added to the house. The end wall...
Looking out from the dining area towards the rear ...
Wes the tiler has started laying floor tile in all...
Finally some colour on the walls to add something ...
The Chief closely inspecting and checking the feat...
Shelving has been installed to one side of the gar...
Materials stored in the garage ready for installat...
Photo of the main bedroom with David the painter s...
Looking from the front entry area towards the stai...
A little bit of paint and shades of colour have tr...
David the painter (Davey to some) and Paul (Pauley...
Joinery has been going in over the last week or so...
The boys have completed the cypress pine framed pe...
The chain down pipe has also been installed in the...
The front entry pond is now being slowly filled wi...
►
May
(6)
►
April
(17)
►
March
(2)
►
February
(3)
►
January
(4)
►
2009
(59)
►
December
(5)
►
November
(44)
►
October
(9)
►
September
(1)
About Me
Mike and Lee
View my complete profile
No comments:
Post a Comment